Soft Tooling from www.smartmoldtech.com
SmartTech can delivery of first article samples, 3 – 6 weeks
Delivery of production, 2 – 12 weeks after First article approval
Soft tooling is less costly than Hard Tooling
Pattern cost is higher than Hard Tooling. This is because the tooling will cycle slower due to the poor thermal conductivity of mold material
Life of soft tooling is limited. Life will depend upon the complexity of part. The more complex the shorter the life
Surface finish and dimensional control is not as good as Hard Tooling
A single SLA (stereolithography) or Objet pattern is generally used to make the tooling